20 July 2008

The Driveway Project - Part 4

Okay, so in The Driveway Project - Part 3, I told you how we came back from a weekend away to a bit of a disaster on our hands. We'd been trying to back-fill along the edges of our new driveway, with limited success. The good news is that things have improved significantly since then, even with a few set-backs along the way.

After seeing the paper based erosion control blanket ripped apart by gushing water, we decided to abandon that technique and try something a bit more heavy-duty. I found rolls of "burlap" (also known as "hessian") at the hardware store. This is a much stronger fabric like blanket that we thought should hold the soil and seed in place in the event of more rain. Well, after spending the entire weekend moving literally tons of dirt and re-doing the washed-out sections along the driveway, we got to see first hand what happens when a thunder storm hits.

On Monday morning at about 7am, the storm came through. I heard the rain on the sky-lights, went to check the weather radar online, and found a big red splodge heading right for us. I was outside within minutes and the rain was getting harder. With crashes of thunder loud and all around, the heavy rain turned heavier. A blanket of water quickly appeared on the large expanse of asphalt near the house, and like one big monster, stared moving, down the hill.

At about this point, Erin returned from her run (which was no longer a run as the rain was so hard and heavy that she couldn't run). Let's just say, after we saw the torrents of water running down the side of the driveway, we where able to understand how they'd made a 1 foot deep trench. We scrambled with sand bags to stop the water making the already damaged driveway worse. We saw the nylon netting holding the seed blanket in place ripped apart and the blanket wash down the slope. We saw our fresh top-soil, seeds, and many hours of hard work, being washed down the storm drain at the bottom of the driveway. And within about 15 minutes, the storm had passed. Not a very good way to start the day, especially if it's your birthday.

After the storm had passed, we assessed the situation and determined that it could have been worse. The burlap we'd put down after the first storm, actually held up pretty well - there just wasn't enough of it. The seed roll that broke free, did so because it didn't have enough stakes holding it in. So we bought more burlap, moved yet more dirt, and re-seeded again.

The paving company came and made their repair which turned out pretty well:

IMG_9104

We haven't had any more rain since, so the burlap, top-soil and seeds are all still in place:

IMG_9141

And lots of regular watering with the hose, means the grass is starting to grow:

IMG_9108

We even decided to put some sod/turf rolls down over the area that had the water damage and has since been repaired, so that's looking good too.

IMG_9145

After the last two storms, things have gradually been improving. However, the next test is coming tonight. Thunderstorms are forecast, and there's an 80% chance of rain. I might be waiting up with my flashlight to see what happens next...

18 July 2008

Asphalt Prices Skyrocket

The price of asphalt is sky-rocketing (it's oil based) as you can see in this News Report. It's gone up by almost 50% in the past few weeks, for example:
July 16 - 31, 2008   
$700
July 1 - 15, 2008$625
June 2008$517
May 2008$447
April 2008$410
March 2008$362

I'm glad we got the driveway installed already!

14 July 2008

Into The Wild

With our upcoming Alaska trip on our minds, we recently watched Into the Wild. It was good, albeit a little disturbing. Based on a true story of a young man trying to find himself, it's on my recommend-to-a-friend list.

11 July 2008

The Driveway Project - Part 3

Disaster! We went away for a long weekend and came back to a disaster-zone.

Prior to leaving, we'd spent several days moving dirt, planting new grass seed, and watering. With over 1000 linear feet of driveway edge to work on (and with drainage concerns still in my mind), we prioritized the areas and began working on two main sections: around the bend at the top where I expected water to flow over the edge, and at the bottom where cars like to turn around.

We began by preparing the area by adding and leveling fill and top-soil, as you see here:

IMG_9069

We then decided to try 2 alternative methods of seeding.

The first was using a paper based "seed roll" that had seeds and fertilizer mixed within a 80ft x 3ft paper roll.

IMG_9073

The second was using a wood based 50ft x 4ft roll that was made of straw-like wood fibers against a nylon mesh.

IMG_9077

At this point, the paper roll looked favorable. It was the easiest to lay down and had the seed and fertilizer all ready to go. With no rain and hot weather, several days watering followed. The first seedlings where starting to sprout just before we had to leave for a few days away. We hoped that they would survive until we returned...

We arrived back at the house in the evening just as it was starting to get dark. We'd seen rain in the forecast while we where away, we just didn't know how much. At the bottom of the driveway, in contrast to the jet-black fresh asphalt we'd left, this is what we saw:

IMG_9092

You can see dirt, gravel, and wood chips washed across the asphalt. It looked like a mess, and we started to get a picture of how much rain we'd missed.

On moving up the driveway (walking at this point), there was more to come:

IMG_9090 IMG_9085

At this point, things where looking pretty bad. "This is not good.", I yelled back to Erin.

IMG_9094 IMG_9088

But the worst was yet to come. At the top bend, there was a complete collapse:

IMG_9082 IMG_9097

As you can see, we found a new 1 ft wide and 6-12 inches deep ditch running along a large part of the driveway. If you compare this to the earlier photo of the same area (as we left it) you might get an idea of how much of a shock this was for us. And needless to say, I was not a happy camper.

It turns out that while we where away some thunderstorms came through and dumped about an inch of water within 2 days. by the size of the ditches the rain created, I can only assume that the water must have come down pretty quickly, like 1/2 inch within an hour on each day. Once again, not happy.

So, I called the paving company and explained to them what had happened. They sent someone out to look at it, and will be returning to next week to try and repair it. We've started working on clean-up, and re-doing the areas that got washed out. I'm getting over the initial shock, things are gradually returning to normality, and we've got another weekend of moving dirt to look forward too.

On a more positive note, after all the rain, the new grass is growing:

IMG_9080


But in the meantime, my thoughts return to drainage ditches and erosion control.

I'm sure there'll be more updates on The Driveway Project to come.

01 July 2008

The Driveway Project - Part 2

In my last post on the driveway project I told you that the paving company was returning to continue working on the driveway. Well, I got a call that Monday saying that they wouldn't be coming because thunder storms were in the weather forecast. The same thing happened on Tuesday. I was getting increasingly annoyed at this point and told them that they should at least send someone out to have a look at the settling/erosion that had happened over the past couple of weeks. They must have got the message, because they showed up on Tuesday afternoon. They did some more leveling to smooth over the recently created water-ruts, and I helped them mark (with string, measures, and bright orange spray paint) where the asphalt needed to be poured. Things were looking good - it was all marked out and there was clear weather in the forecast.

On Wednesday morning the paving crew started showing up at about 8am. The crew consisted of 8 guys. Their roles were roughly: 2 truck drivers, 2 paving machine operators, 2 to ensure the asphalt was flowing, and 2 edging behind the machine. Of course there was other stuff to do as well, and they also switched around a fair bit. Anyway, shortly after the crew turned up, so did the first load of asphalt and we were in business. They started at the top of the hill near the house. This was probably the hardest bit, since it covers a large area which means there's lots of joining to do. By 1pm they had made it about half way around the bend at the top of the hill and where approaching the straight. Several truck loads later they were almost at the bottom of the hill. And at around 5pm they finally made it to the end of the driveway where it joins the road.

There were a couple of minor hiccups along the way:
  • Dragging the plate compactor over the freshly laid surface. This left a mark on the driveway for about 50ft or so. Hopefully it will fade.
  • Running out of asphalt for about 45 minutes until the next truck returned. Not good since laying asphalt should be a continuous process where joins are completed while the material is still hot. There's a slight bump you might notice when driving over the join that had cooled.
  • Laying a "wiggle" near where the driveway joins the road. I guess they must have been getting tired at this point (they'd been at it for 9 hours). This would have bugged me, so I asked them to correct it by adding to once side, cutting away from the other, and now it looks much better.
  • Steam-rolling over the edge. Again, this happened near the end and I attribute it to fatigue. It squashed the edge down for a couple of feet, but probably won't be that noticeable after grass is growing.
Overall, I think they did a pretty good job. I'm glad I was around to keep an eye on them though. I liked working with this paving company because they wanted to do a good job that I was pleased with. I liked the fact that they would listen to me when I suggested something or told them what I wanted. The leveling/grading is especially impressive: I tested this by using the hose create a puddle of water in the middle of the driveway at the top of the hill. As I added water, the water soon started to flow down the hill. The impressive part of this is that the water flow made it's way around the bend, and all the way down the hill, before crossing the driveway and exiting in the precise location I wanted - about 300ft away from where I'd started the puddle. After seeing this, I'm hoping that my initial concerns about the drainage will turn out to be water under the bridge.

IMG_9062

Here's a link to photos from asphalt pouring day.

Next up is moving the 20 tons of dirt required to backfill 4000 square feet of new driveway-edge...