18 September 2008

More Dirt

Guess what?! We’re moving dirt again. We just can’t get enough of the stuff. Here’s a photo of this mornings delivery:

The plan for the weekend looks like this:
  1. Prepare the target areas by raking and leveling.
  2. Distribute cart loads 1-10 to the rock side of the driveway.
  3. Distribute cart loads 11-16 to the pole side of the driveway.
  4. Distribute cart loads 17-18 to the top of the driveway.
  5. Over-seed the edge of the driveway on the hill.
  6. Spread cart loads 19-22 lightly over the seeded areas.
  7. See how much is left, move cart loads 23-30 to holding area.
  8. Seed and burlap the new areas.
And somehow we have to fit in transplanting peonies, cutting grass, and working on the new flowerbed.

Sounds like fun!

No comments: